Process Chemical Expansion
- Blast-resistant masonry process room with steel-framed mezzanine
- 8,100 sq. ft. pre-engineered metal chemical storage warehouse
- Truck loading dock
- Tank farm expansion
- Equipment and process piping specification and installation
- Site work
- Secondary containment
- Electrical service
- Heating and ventilating system design
- Instrumentation and controls
- Project Management
- Civil Engineering
- Structural Engineering
- Mechanical Engineering
- Electrical Engineering
- Instrumentation Engineering
- Construction Documents
- Bidding Assistance
- Permit Acquisition
- Construction Management
$3.7 Million
August 2004
|
|
Process chemical expansion to store over 300 raw materials and produce over 200
products
|
On an extremely fast-track schedule, JHI provided design, permit acquisition, and
construction management services that allowed our client to go from a brown field
site to startup of a new chemical process in only eight months. JHI’s design team
met the challenges of the process’s hazardous nature with innovative solutions that
minimized construction time. Our understanding of code and jurisdictional requirements
facilitated the complex permit process and allowed the construction schedule to
be maintained. Using our knowledge of the design and our client’s needs, JHI provided
construction management services that further expedited the project.
|